The fire devouring Nador’s dream. Opening of an immediate investigation to stop the drain of public money

This article was automatically translated from HIBAPRESS, the Arabic version:
This article was automatically translated from Hibapress, the Arabic version:
Heba Press: Muhammad Zaruh
In the light of continuous respect for projects and delay in their completion in the Nador region, silence is no longer acceptable, nor the tolerance is justified. The fire of the municipal swimming pool, which broke out this morning on Sunday, and came to the facilities of a project that the population has been waiting for for over 18 years, is not only an accident, but rather a blatant indication of a structural defect in the management of public affairs.
What happened inside the pool workshops is clearly highlighted the absence of security conditions, poor surveillance and the lack of coordination between the intermediate parties, in a project whose completion rate was approximately 95%, according to declarations of the head of the Nador group, Mr. Suleiman Azawg, who came to the place as soon as he learned the incident. He stressed that the authorities planned to officially open the swimming pool in July, expressing his deep regret of what had happened, noting that the accident would delay the project again, at a time when the population was waiting for the time of its opening for many years.
Faced with this reality, there is today no alternative to the opening of a complete and responsible investigation in all the ongoing projects in the region, in order to determine the faults and to hold responsible for those which allow to waste public money, and to stop the bleeding which exhausts the treasure of the State without concrete results. Accounting is not a political choice, but a national necessity imposed by the scene.
Link of connecting responsibility and accelerating the pace of implementation of structured projects, is one of the urgent measures that must be taken to restore the confidence of citizens and to ensure minimal justice, especially in a city with marginalization and mismanagement for many years.
The delay in the move and the leash of things took place at the same rate, will only exacerbate losses and deepen collective frustration, and the progress of the region is hampered towards any horizon of real development. What is waste of time and money in a single project will be a warning bell for everyone.
The fire of the swimming pool today is only a model of many examples of what has been lost, of what has been neglected, and of what was spoiled … And the real victim, as a whole, is the city and its inhabitants.
.Hibawts {display: inine-flex; Align-Eeetems: Center; Justification-contained: Center; Background color: # 25D366; padding: .5rem 1.25rem; Police size: 1st; Link-Height: 1.5rem; Police-point: 500; -Tw-tox-opacity: 1; Transition time:. 7s; Transition timing funiating: Cubic-Bezier (. 4.0, 2.1); Width: 49%; } .HIBAWTS SPAN {Color: #FFFFFS; } Padding: 10px; Border-Radius: 10px; Color: #FFF; Police: Bold; Display: inheritance; Marge pot: 5px; } Padding: 10px; Border-Radius: 10px; Color: #FFF; Police: Bold; Display: inheritance; Marge pot: 5px; } Padding: 10px; Border-Radius: 10px; Color: #FFF; Police: Bold; Display: inheritance; } Width: 3rd; Height: 2m; ADIGNE VERTICAL: Middle; Display: online block; Marge: Var (-google -News-icon-Margin); } Url (“https://ar.hibapress.com/wp-constrent background-size: auto; background-size: 2m 2em;} url (” https://ar.hibapress.com/wp-content/themes/hibapress/hiba.svg?6.52#sshare- Telegramgramgramgramgramgramgramgramgramgramgrantargramess-size: Auto; last news from Heba Bress on x